BWB has played a key role in the development of one of the UK's most significant Enterprise Zone developments undertaken as a join...
The historic Pebble Mill site, part of the Calthorpe Estate in Edgbaston, was the BBCs Birmingham home for over 40 years. Its phas...
BWB's multidisciplinary expertise played a key role in the delivery of this £22 million flagship scheme for the University, which...
BWB are very proud to act as main structural engineers for this exciting development on the City Hospital campus, just north of No...
The Rowsley Flood Spans carry the A6 over the River Derwent in Rowsley. The spans are located on the left bank of the channel and ...
Kingsway business park has a drainage system in place, with a sewer network adopted by United Utilities and several detention basi...
CBG is a mining company located in the Republic of Guinea. A subsidiary of CBG operates the Boke railway to transport ore from its...
The client has submitted a hybrid planning application for a proposed mixed use residential led development, consisting of up to 1...
The current system fitted on the Chiltern Lines is SELCAB ATP and provides trains with continuous protection against a SPAD and/or...
The Core Valley Lines (CVL) Transformation is a £740m programme of works that forms a significant part of the South Wales Metro P...
New science teaching block, external escape stair and ramp along with internal remodelling of existing buildings at Selly Park Gir...
The secondary school comprises a new 5 storey, brick clad educational facility in the grounds of an existing primary school in Lon...
BWB were appointed by Nexus to undertake survey and design work for the renewal of life expired Switch and Crossing units at three...
The regeneration of the Seedley area of Salford to provide new 160 new dwellings and infrastructure to a brownfield site. Once oc...
BWB is leading the design of the £16M A49 Goose Green to Westwood Park Link Road in Wigan, Greater Manchester. The scheme consis...
Infinity Park is a manufacturing focussed technology park located south of the city, adjacent to the global HQ of Rolls-Royce Civi...
BWB were appointed as designers for diverting an existing HV cable route in the cess area from the top of an embankment between Wo...
BWB Consulting provided design engineering services for the A605 Kings Dyke Level Crossing Closure and Bypass project - a new road...
Stage 1 of the Parramatta Light Rail comprises of 12km dual track alignment, with a mix of on-street and dedicated corridor includ...
BWB's Client, Rendel were appointed by Eurotunnel as the Principal Contractor to design & construct a new Modalohr Station within ...
Stage 1 of the Parramatta Light Rail comprises of 12km dual track alignment, with a mix of on-street and dedicated corridor includ...
BWB was selected as the Signalling Layout designer for French Hill Depot in August 2020 by CAF Signalling. A JV of CAF and Shapir ...
BWB was appointed as the multi-disciplined designer by the Isle of Man Railways to produce a track renewal scheme and construction...
BWB were appointed by Shapir Civil & Marine Engineering Ltd to undertake the track for the J-NET Jerusalem Light Rail Project. A J...
This £24 million project includes the construction of a new student accommodation complex. The 101,375 sq. ft. development is spl...
BWB were appointed to deliver the design of a new footbridge spanning over the existing railway (Brighton lines). BWB were involve...
BWB have been appointed to undertake the surveys and option selection for the gauging workstream of the new Class 197 rolling stoc...
The Dandara residential development is the second development on the Arena Central site and consists of twin towers, 21 and 25 st...
Securing our position as technical services provider to the client through competitive tender, BWB Consulting’s pro-active appro...
This is a sequential housing redevelopment of the former SAPPI Paper Mills (Star Mill and Sun Mill) at Feniscowles near Blackburn....
The proposed Energy Centre will be built on land on the south-western side of the former colliery site.
The Southmo...
Infinity Garden Village in Derbyshire is one of the first 14 identified garden villages by the government and comprises 3,500 dwel...
The Turning Point was Nottingham City Council's ambitious multi-million pound project to substantially reduce the dominance of mot...
The projects aim was to refurbish the existing building to provide a more agile, collaborative working environment. The work compr...
BWB Consulting have provided multi-Discipline consultancy services for this significant project in the centre of Nottingham, formi...
The site is located on the southern edge of Nottingham and comprises a residential development of 3000 dwellings, employment, scho...
A new build 66 bed dementia care home to include a 20 bed intermediate care unit. All design elements were required to comply with...
Unity Square provides 28,000m2 of Grade A office accommodation over ten storeys for HMRC at the heart of Nottinghams south side re...
A proposed development in New Malden has been granted planning approval. Plans include demolishing the buildings at numbers 5 to ...
Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Sti...
Commissioned to enable the construction of the Imperial Street development of 900 new homes as well as workspaces, retail and leis...
BWB were appointed by HBD to provide civil and structural services for the construction of the first phase of redevelopment at Mon...
BWB supporting Pinnacle Property (SMAA Developments) with the promotion of a strategic residential led new settlement near Pershor...
This existing 1869 built building started life as a Masonic Hall. In the 1920s it was converted into a cinema. Now the building is...
This existing 1950s reinforced concrete farmed building occupies a prominent city centre location and contributes to 3 key streets...
We were appointed with Careys Civil Engineering by The All England Lawn Tennis Club (AELTC), which runs the Wimbledon tennis champ...
The Edgbaston Priory Club is a private members' tennis, squash and leisure club in Birmingham with a capacity of 2,500 people. Ac...
Winvic Construction Limited requested BWB investigate the possible cause of the appearance of voids and excessive settlements note...
BWB is proud to have played a key role throughout the planning and implementation stages of this 70-acre office and industrial spa...
The Western Gateway Infrastructure Scheme (WGIS) is £30M worth of road improvements that are being delivered by a joint venture b...
BWB's involvement in this 40 hectare urban regeneration project commenced when we were appointed by Buckingham Group to act as the...
BWB Consulting has delivered multi-disciplinary engineering and environmental services for HSBC's new headquarters in Birmingham c...
The seventeen storey mixed use development located next to Streatham Rail Station in the London Borough of Lambeth replaces an exi...
The Enterprise Zone at Blackpool Airport became active in April 2016, and runs until 2041, giving businesses incentives to invest ...
BWB provided multi-disciplinary services to a site in Selly Oak that was formerly used as iron foundry, gas works and commercial a...
BWB have worked closely with Therme Group and Peel to bring plans to build the UKs first city-based wellbeing resort to Trafford C...
BWB provided a fully integrated civil and structural design for the rail terminal.
BWB delivered the engineering de...
The Research Acceleration and Demonstration (RAD) Building is a new £7 million research facility at the University of Nottingham'...
Sugar House Island is a 10.5 hectare regeneration scheme in Stratford, just south of the Olympic Park. The scheme will provide a m...
Somerleyton Road is an exciting community partnership that will see around 303 new homes, a theatre, a range of mixed uses includi...
A former quarry was being developed for the construction of approximately 100 residential units. The site was steeply sloping in p...
BWB's London based M&E team were selected to be part of the Bond Bryan Architects lead design team for this new build student resi...
East Midlands Gateway is a nationally significant infrastructure project. This £500m logistics park, privately financed by SEGRO,...
BWB are providing a complete range of Pre and Post Planning services to Inspired Villages who are developing a number of proposed ...
This Phase 2 of the redevelopment of Beeston Square included an eight-screen cinema, as well as food and drink outlets and 132 new...
BWB were appointed by HBD to provide civil and structural services for the construction of a bespoke industrial unit at Airport Bu...
Remodelling of the ENT department to provide an expansion of service delivery, a better patient flow process and new technical fun...
Project involved the regeneration of the former Lucas Battery Factory in Selly Oak and then the development of new retail park, Sa...
A new IKEA store in the heart of the London Borough of Greenwich. The IKEA store is a 3-storey building with a large roof garden. ...
BWB Consulting were appointed to provide structural, civil and geotechnical design services on this mixed used city centre develop...
BWB helped deliver the successful planning application for this £21million mental health facility for young people in Nottingham....
The Broadway Green mixed-use scheme will see 121 acres of land in the Foxdenton area of Oldham developed into an exciting new busi...
Lewisham Gateway is a PPP venture between Muse Developments, TfL and LB Lewisham. The scheme requires major infrastructure changes...
BWB Consulting provided engineering design services for series of road bridge replacement schemes in Monmouthshire.
...
BWB Consulting provided engineering design services for series of road bridge replacement schemes in Monmouthshire.
...
BWB Consulting provided engineering design services for series of road bridge replacement schemes in Monmouthshire.
...
Atrium Refurbishment and fit out of an existing vacant building with adjoining atrium, into high quality office space and break ou...
BWB worked closely with Midlands Metro to review their light rail route between Birmingham and Wolverhampton to identify any safet...
The project comprises the demolition of the existing 1896 school building and construction of a new 3 storey educational facility ...
Our multi-disciplinary skillset provides a one stop shop for engineering, environmental and scientific services associated with pr...
BWB are proud to be involved in this purpose-built state-of-the art student accommodation in Southampton.
The devel...
Trafford Waters is a high density residential development with mixed use and commercial elements located in Trafford City, adjacen...
350 PRS apartment scheme which has helped deliver much needed affordable and flexible living to Nottingham, and regenerated a brow...
The project comprises the construction of a new active campus and student village in the heart of the Loughborough University Camp...
This development comprises 298 privately owned apartments over 11 storeys with retail and commercial spaces and car parking at gro...
BWB Consulting was instructed by Linden Homes to support the planning application for a £90 million redevelopment of the former S...
As part of a due diligence appraisal exercise, property portfolios were assessed specifically in terms of flood risk. A variety o...
BWB Consulting provided multi-disciplinary services for the £33 million Wakefield Eastern Relief Road scheme. The by-pass was des...
Hong Kong-based developer Lei Shing Hong, the worlds largest Mercedes-Benz dealership, has completed the 350,000 sq ft car showroo...
BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposit...
BWB's involvement in this 44-acre urban regeneration project commenced when we were appointed by Henry Boot Developments Ltd to ac...
BWB were commissioned to provide advice to support the land sale of this proposed residential development which would comprise of ...
BWB Consulting has delivered multidisciplinary engineering and environmental services for this student accommodation scheme which ...
The project aims to provide the wider Whitehouse development in Milton Keynes with a brand-new Health Centre. The Health Centre co...
Butterfield Business Park in Luton is situated less than five miles from the M1. The existing site comprised an innovation centre,...
The demolition of two existing building at Skys headquarters, to enable the construction of one green building. Careys were employ...
Development of circa 90Ha of greenfield farmland to form an industrial / distribution hub off the A194 in Gateshead. BWB have pro...
BWB have been involved as geo-environmental, civil and structural engineering design consultants for Nottingham Business Park deve...
This greenfield site is located to the west of Market Harborough and is part of a larger Strategic Development Area (SDA), with a ...
BWB are delivering a range of multi-disciplinary services for the £100 million Brough South mixed-use development in Yorkshire. T...
BWB has been involved in the planning stages of this exciting project to convert an iconic office building in Bradford into almost...
As part of a wider strategic development known as Infinity Park, Derby, a proposed Link Road and construction of a Flood Alleviati...
Derby Arena was developed to support wider participation in sport and motivate and inspire current and future generations. The Are...
Dorney Lake is British Canoeings main on-water training venue and was a competition venue for the London 2012 Olympic Games. In co...
BWB Consulting played an integral role in expediting the accurate and effective surveying of a Victorian road bridge in Lichfield ...
Wyvern Park is a proposed 50-acre mixed-use development which is strategically located on the bypass south of Skipton town centre....
BWB played a key role in the successful delivery of a new bridge over the Great Western Main Line at Shrivenham, Oxfordshire. The ...
Navigation Point is a 900-dwelling riverside residential development which is located within walking distance of Castleford town c...
BWB are proud to be working on this luxurious new high spec 4 storey residential development in Hoxton - the cultural and bustling...
Initially BWB were commissioned to undertake a Geotechnical Assessment of this site in order to advise on the land sale. 114 resid...
Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and commun...
BWB Consulting was appointed by Wilson Bowden Developments to deliver multi-disciplinary engineering services for the Optimus Poin...
The new build Coral Springs Care Village development in Witney, Oxfordshire for Richmond Villages provides the following accommoda...
The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy c...
BWB were proud to be appointed to work on the £12 million gateway scheme at Eastpoint Retail Park in Nottingham. The project invo...
The project aimed to demolish the existing Heston House to build Edison Primary School on its existing site, to create a 3 form-of...
Development of a new 300,000 sq ft retail development for IKEA including new retail space, warehousing external car parking and la...
This "best-in-class" business park for national and international manufacturing and logistics businesses lies adjacent to a major ...
Harington School is a £4.2m new build sixth form centre including general teaching classrooms, specialist information technology ...
BWB Consulting were instructed by The University of York through Faithful &Gould to undertake civil & structural design services f...
BWB Consulting is proud to be part of the team delivering the exciting £400 million iPort logistics development in Doncaster. The...
The development is a proposed distribution park across a 40 hectare site to the west of Coalville. The site had many constraints, ...
The masterplan for the former Newmarket Colliery site in Wakefield proposes a major mixed-use development of distribution and comm...
BWB was approached by Durham County Council to design an effective flood alleviation plan for the village of Lanchester, County Du...
In 2012 BWB were appointed as the Civil and Structural Engineer for the new £40m dual-sided Gloucester Gateway Motorway Services ...
Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. ...
Blackpool Tower is an iconic grade 1 listed landmark and a great feat of Victorian engineering. Built in 1894 and standing at 518 ...
The project involved re-purposing of two existing office buildings in Horsham into residential apartments under permitted rights d...
BWB have been continuously working on the White Rose Shopping Centre for the past 8 years. We have been commissioned by Land Secur...
BWB played a key role in Nottingham's NET Phase 2 tram extension, delivering transport, traffic signal and infrastructure design s...
BWB has delivered multi-disciplinary consultancy services for the regeneration of the historic former Tetley Brewery in Leeds, pla...
BWB Consulting was appointed by the IM Group in 2014 to review the impact of the HS2 railway line on the Coleshill Manor Estate wh...
Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network p...
BWB are providing multidisciplinary consultancy services in support of this significant regeneration scheme in the centre of Notti...
Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centr...
BWB played a pivotal role in the planning and detailed design of this 300 000 sq ft Advanced Manufacturing and Technology Facility...
BWB Consulting is proud to have been the Civil and Structural Engineers for Resorts World at Birmingham's NEC. The £150m developm...
BWB were appointed by Morgan Sindall to provide civil and structural engineering services for 2 phases of student accommodation in...
As a city Leeds is thriving and has seen a significant growth in its population.
This includes an increase in the n...
Development of a new 330,000 sq. ft. retail development for IKEA including new retail space, warehousing, external car parking and...
BWB were proud to provide multi-disciplinary engineering services for Alumno Developments 659 bed Student Accommodation project at...
Southwater Leisure District in Telford incorporates prime town centre offices, new leisure space including cinema, hotel, restaura...
The former Prince of Wales colliery site near Junction 32 of the M62 on the northern outskirts of Pontefract is to be regenerated ...
The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide home-in-hospital for around 250 adult Cystic F...
BWB was excited to take on the challenge of upgrading this 800 B&B backpackers and party hostel in central London housed within a ...
The development involved the conversion and extension of a Grade II Listed former wire factory in Lindley to facilitate the increa...
The Trent Basin scheme is a sustainable urban neighbourhood of +150 homes situated approximately 2 miles southeast of Nottingham C...
The city of Nottingham saw a number of major long-term construction projects begin in 2013 including Nottingham Express Transit, P...
Promotion of circa 30ha site spanning three planning authorities and two counties, for employment usage through outline to deliver...
Logistics North is one of the largest distribution developments in the north of England where BWB have been proactively involved s...
Provision of engineering and environmental advisory services, with respect to an outline Planning Application for the development ...
BWB assisted the Client with securing planning permission for c. 220 dwellings in the Cheswick Green area of Solihull. BWB provid...
BWB Consulting is proud to have been involved in the construction of a 250-metre outdoor tarmac velodrome at the University of Yor...
BWB Consulting have been appointed to deliver the construction of a mixture of apartments and retail units in St. Anns, Nottingham...
BWB provided multi-disciplinary consultancy services for the £9 million York Sport Village on the University's Heslington East Ca...
Completed in three phases in 162 weeks, Chettles Yard student accommodation centre sprawls over 10 acres and provided 1,063 studen...
BWB Consulting was appointed by Stoford Developments Ltd to provide civil, structural, geo-environmental, flood and traffic servic...
BWB were involved in the project from inception, advising on geo-environmental desk studies, intrusive ground investigation works ...
Nottingham One is a mixed use commercial and residential scheme comprising 290,000 sq. ft. of development. The scheme includes 2 l...
BWB Consulting were employed directly by the University of York for the 2 phases of the Plasma Institute. The Plasma Institute is ...
BWB were appointed by Stoford Developments Ltd to provide civil, structural, geo-environmental, flood and traffic services on Seve...
BWB was the civil and structural engineer for the prestigious redevelopment of the old Market Quarter of Wakefield town centre. Th...
Larkhill is a 327-unit retirement village on a greenfield site on the southern outskirts of Clifton, Nottinghamshire. The £35m pr...
The Pod development is an important landmark site in the heart of the City of Nottingham. It consists of three retail floors, a tw...
BWB were appointed by Blueprint, a public/private sector JV regeneration company, to apply our full range of multi-disciplinary se...
The Litmus Building forms Phase 1 of the larger Litmus complex which at the time was largest residential new-build project of its ...
BWB Consulting provided multi-disciplinary engineering services for this prestigious £900M development scheme to transform a 17 h...
BWB Consulting provided expert traffic signals and modelling skills in reviewing and re-designing shared use traffic signal contro...
This striking project was phase 1 of a three phase office development designed to centralise Experian's Nottingham operations and ...
BWB was appointed by Wilson Bowden Developments to provide environmental, geo-technical, civil and structural engineering solution...
A city centre development providing 605 student bed spaces. The build included a 15,000 sq. ft. supermarket, 40,000 sq. ft. of add...
This award-winning attraction in the heart of National Forest is located within a reclaimed mining area which is surrounded by a m...
The scheme comprises a number of modern detached self-contained headquarters office buildings providing accommodation over ground ...
Originally built for 600 workers involved in lace production, the Adams Building was considerably extended to cope with a rapid gr...
The Queens Road project is a new residential development in the centre of Nottingham located adjacent to the railway station. It ...
BWB supported the planning submission in 2020 providing transport planning, plus noise and vibration services.
Kin...
The project comprises the redevelopment of the former cattle market site located to the South of Rugby station and bound by Craven...
£35m development of 280 apartments over 24 floors in the centre of the Birminghams Jewellery Quarter. The site is a former quarr...
Development of a £110m, 480 apartment scheme over two blocks as part of a wider regeneration scheme in Bradford. The scheme is co...
The project involves the provision of new hard and soft landscaping associated with the construction of a new Luxury Hotel, with 1...
The project involved the change of use and refurbishment of the old Smith and Nephew research and development building into The Yo...
Extension to existing school to create 4No. additional classrooms and provision of additional WCs and Group Rooms at Christ Church...
New Build Teaching Block, extension to existing science Block and refurbishment of a further 3No. existing blocks to create new ch...
Saracens School is a new-build, three storey education building with a separate sports block on a brownfield site in Colindale, Lo...
BWB provided planning application support for the redevelopment of two sites on Princip Street within the Gun Quarter area of the ...
Brownfield redevelopment , Construction of c.366 residential units, consisting of 1,2,3 bedroom flats. Split across two separate a...
New 2 storey & single storey Sixth Form Teaching Block on a brownfield site, within the grounds of the President Kennedy School
Pinner High School consists of several interlinking buildings which were built at different times throughout its history, the orig...
A flood defence scheme in the centre of Derby which saw BWB and nmcn partner to deliver improvements to Pride Park, Full Street, E...
BWB recently undertook the New Walk / King Street Public Realm detailed design for Leicester City Council. The scheme forms part o...
BWB have partnered with nmcn and DSA to design and build a new public realm scheme for College Street on behalf of Rotherham Metro...
Total strip back to blockwork of the existing poor condition render finish to the exterior walls, walkways and chimneys to the 8 e...
Rehanging of over 120 balcony doors and windows due to insufficient support and inadequate structural detailing causing them to dr...
Replacement of defective timber windows. Original timber window frames were installed in a very substandard way, contrary to curre...
BWB delivered the Transport Assessment, Travel Plan, Transport ES Chapter, Flood Risk Assessment and Drainage Strategy to support ...
The East Midlands Track Alliance (EMTA) is a consortium formed by BWB, Integ Solutions and Nottingham University to work with UK T...
Watermead Business Park is a multi-milion, premium quality office development on the north side of Leicester. It is ideally locate...
The Grove is a residential development which has been developed under the Permitted Development planning rights. This was a 3 stor...
The project involved refurbishment, alterations and conversion of the former Magistrates Court, a Grade II listed building to prov...
This 35-hectare mixed-use development of 430-homes and employment land at Penniment Farm in Mansfield required substantial off-sit...
The Transport Planning expertise of BWB played a key role in helping Barratt Homes secure outline planning consent for 100 homes i...
BWB delivered a range of multi-disciplinary solutions that helped secure outline planning consent for 94 houses and a community ce...
The multi-disciplinary expertise of BWB played a key role in helping secure outline planning consent for a 230-home extension to t...
BWB's Transport Planning team played a vital role in helping a Leicestershire council to block plans for a residential development...
The Edith Borthwick School is an SEN school which caters for youngsters with learning disabilities aged three to 19. The project, ...
QMP acted as the Quantity Surveyor on the refurbishment to the existing library for University of Westminster. The scheme involved...
QMP provided client side project management & quantity surveying services for the scheme, which involved remodeling the lower grou...
Our work covered building survey and the completion of NHS 6 facet surveys in accordance with the Estate Code, including Physical ...
Our commission included the preparation of condition survey and reports for a number of important and significant university build...
Our work covers the undertaking of condition surveys and preparation of reports for the entire estate over a 7 year ‘cycle’ pr...
BWB Consulting played a key role in helping to secure outline planning permission for the conversion of this historic college site...
BWB Consulting provided a range of multi-disciplinary services for a new Waitrose store at the historic Wiltshire town of Malmesbu...
BWB Consulting was commissioned by Buckingham Group to deliver civil engineering and infrastructure design services to enable the ...
BWB Consulting has delivered a range of multi-disciplinary services for the first parcel of housing at the 77-acre Prince Of Wales...
The new £4.5m maternity unit at Kettering General Hospital was constructed as part of the P21+ framework. The development was des...
BWB have been appointed to develop the new Intu Potteries shopping centre redevelopment in Stoke. The 58,000 sq. ft. scheme compri...
BWB have provided multi-disciplinary services on the first facility to be completed at one of Europe's largest logistics developme...
BWB undertook a review and appraisal on the performance of the Wastewater Treatment Works serving Heywood Distribution Centre.
BWB was delighted to be involved in the creation of a 9,000 space car park at Manchester Airport, the third busiest airport in the...
A major £4 million re-development of Cecil Court in Enfield will see the former office building converted into 42 one and two bed...
BWB has played a key role in the acquisition and planning stages of a £100m mixed-use development at the former Didcot A power st...
BWB Consulting were employed to provide design services for the construction of a new Asda Supermarket on an existing retail park....
The College Gate development site is situated in Brandhall, a heavily urbanised area of Birmingham.
Following the o...
Ernesford Grange Community Academy in Coventry is due to be handed over this week, 6 weeks ahead of schedule.
The ...
BWB Consulting is providing multi-disciplinary engineering services to Arena Central Developments Ltd for this exciting project in...
BWB was first appointed in 2005 by Strawsons Property to provide comprehensive environmental and civil engineering services for th...
BWB's SBS Team were contracted by EIC Ltd, to provide mechanical design for a new 17,000m2 production facilities and office develo...
BWB Consulting were a major part of the winning bid team put together to deliver the School Of Health and Sport Science Extension ...
The £23M improvement scheme to Farnley Park Maths & Computing College contract was constructed as part of the Leeds Building Scho...
BWB Consulting were a major part of the winning bid team for the delivery of the striking Darlington Campus Building for Teesside ...