Contact Us:

0115 924 1100
nottingham@bwbconsulting.com

Contact us

Sustainable Buildings Design Bookmark and Share

Utilising an holistic approach and early consideration of Building Services Design into the initial stages of the design process will help the building to reach its full potential in the Sustainability stakes. More recently the emergence of "Passivhaus" method of construction takes Sustainable Building Design to the next level.

Sustainable design is the thread which runs through each of our projects from start to finish. By always being part of our design ethos, it means the majority of our project work achieves higher BREEAM/EPC ratings than expected.


Related Projects

Coombe Road, New Malden

A proposed development in New Malden has been granted planning approval. Plans include demolishing the buildings at numbers 5 to 29 Coombe Road and building one three-to-five storey and one six-to-se...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Napier Gateway, Luton

Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Stirling Place which incorporates 685 residential apartments of up to 17 ...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Somerleyton Road, Brixton

Somerleyton Road is an exciting community partnership that will see around 303 new homes, a theatre, a range of mixed uses including a new flexible community space, an educational space, cultural and ...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

RAD Building, University of Nottingham

The Research Acceleration and Demonstration (RAD) Building is a new £7 million research facility at the University of Nottingham's Jubilee Campus. The research lab is set to be one of the most energy...

Key contacts: Peter Davies Rachel Cheetham

View Project » Create & Download PDF Document »

Hammond Student Accommodation, Chichester

BWB's London based M&E team were selected to be part of the Bond Bryan Architects lead design team for this new build student residential development located in Chichester. The development will provid...

Key contacts:

View Project » Create & Download PDF Document »

Southgate Student Accommodation, Leicester

BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposite De Montfort University campus. The site compromises four buildings s...

Key contacts: Mark Jones Kris James

View Project » Create & Download PDF Document »

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts:

View Project » Create & Download PDF Document »

Resorts World, Birmingham

BWB Consulting is proud to have been the Civil and Structural Engineers for Resorts World at Birmingham's NEC. The £150m development includes a casino, four star hotel and five-star suites, spa inclu...

Key contacts: Mark Jones Andy Passmore

View Project » Create & Download PDF Document »

Horsham Gates

BWB are initially providing engineering consultancy services for the refurbishment of two existing office buildings in Horsham, with potential to extend the residential site in the future. The scheme...

Key contacts:

View Project » Create & Download PDF Document »

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Southwater Leisure District

Southwater Leisure District in Telford incorporates prime town centre offices, new leisure space including cinema, hotel, restaurants and the council's extensions to the existing ice rink, Mecca Bingo...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Generator London Hostel Refurb

BWB was excited to take on the challenge of upgrading this 800 B&B backpackers and party hostel in central London housed within a Grade 2 Listed Building.

The hostel underwent signific...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Cystic Fibrosis Unit, City Hospital

The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide 'home in hospital' for around 250 adult Cystic Fibrosis patients from Nottinghamshire and surrounding.

...

Key contacts:

View Project » Create & Download PDF Document »

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

View Project » Create & Download PDF Document »

Darlington Campus, University of Teesside

BWB Consulting were a major part of the winning bid team for the delivery of the striking Darlington Campus Building for Teesside University. A major feature of the building is the creation of a 'shi...

Key contacts: Mark Jones

View Project » Create & Download PDF Document »

MOOG Aircraft Production Facility

BWB's SBS Team were contracted by EIC Ltd, to provide mechanical design for a new 17,000m2 production facilities and office development on the new technology park, i54 in Wolverhampton. The project i...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Farnley Park Academy, Leeds

The £23M improvement scheme to Farnley Park Maths & Computing College contract was constructed as part of the Leeds Building Schools for the Future (BSF) programme. The project involved the construc...

Key contacts: Dominic Ginty

View Project » Create & Download PDF Document »

School of Sports Science, University of Teesside

BWB Consulting were a major part of the winning bid team put together to deliver the School Of Health and Sport Science Extension for Teesside University at their city centre campus in Middlesbrough. ...

Key contacts: Mark Jones Colin Langford

View Project » Create & Download PDF Document »

Faculty of Business & Law, DeMontfort University

This 100,000 sq.ft. new-build faculty brought together two University Schools, eight departments, 250 staff and 5,000 students into one landmark building at one of the most prominent positions in Leic...

Key contacts: Mark Jones

View Project » Create & Download PDF Document »

Lewisham Gateway, London

Lewisham Gateway is a PPP venture between Muse Developments, TfL and LB Lewisham. The scheme requires major infrastructure changes to the existing roundabout to create a new improved transport circula...

Key contacts: Simon Harden Iqbal Rassool

View Project » Create & Download PDF Document »

Contacts

Name: Mark Jones
Job Title: Service Director - Building Structures

E: Mark.Jones@bwbconsulting.com


View Profile »

Name: David Stairmand
Job Title: Service Director - Sustainable Building Services

E: David.Stairmand@bwbconsulting.com


View Profile »