x

Retaining Structures

Where a sharp change in ground elevation is required a retaining wall is normally used. Using the latest design software our specialist geotechnical engineers can design all manner of retaining walls, including gravity, cantilever, sheet piling, anchored, reinforced earth, gabion, and crib. All the design is done to current British Standards and Eurocode EC7.

Contacts

Name: Dominic Ginty
Job Title: Service Director - Building Structures

E: Dom.Ginty@bwbconsulting.com

View Profile »

Name: Ralph Sibley
Job Title: Technical Director – Ground Solutions

E: Ralph.Sibley@bwbconsulting.com

View Profile »

Related Projects

Market Quarter

The project comprises the redevelopment of the former cattle market site located to the South of Rug...

Broadmarsh Bus Station

BWB Consulting have provided multi-Discipline consultancy services for this significant project in t...

Phoenix Village Bradford

Development of a £110m, 480 apartment scheme over two blocks as part of a wider regeneration scheme...

Raynes Park

We were appointed with Careys Civil Engineering by The All England Lawn Tennis Club (AELTC), which r...

Guildhall, Nottingham

BWB are providing multidisciplinary consultancy services in support of this significant regeneration...

Unity, Nottingham

Unity Square provides 28,000m2 of Grade A office accommodation over ten storeys for HMRC at the hear...

Montagu Industrial Estate - Enfield

BWB were appointed by HBD to provide civil and structural services for the construction of the first...

Battery Park, Selly Oak

BWB provided multi-disciplinary services to a site in Selly Oak that was formerly used as iron found...

IPECO Southend

BWB were appointed by HBD to provide civil and structural services for the construction of a bespoke...

VITA Student Nottingham

This £24 million project includes the construction of a new student accommodation complex. The 101,...

Follingsby Max

Development of circa 90Ha of greenfield farmland to form an industrial / distribution hub off the A1...

Battery Park, Selly Oak

Project involved the regeneration of the former Lucas Battery Factory in Selly Oak and then the deve...

Butterfield Park

Butterfield Business Park in Luton is situated less than five miles from the M1. The existing site c...

Whitehouse Health Centre

The project aims to provide the wider Whitehouse development in Milton Keynes with a brand-new Healt...

Vaughn Way, Leicester

This development comprises 298 privately owned apartments over 11 storeys with retail and commercial...

Saffron Court

350 PRS apartment scheme which has helped deliver much needed affordable and flexible living to Nott...

Crescent Road, Crumpsall

A former quarry was being developed for the construction of approximately 100 residential units. The...

Lewisham Gateway, London

Lewisham Gateway is a PPP venture between Muse Developments, TfL and LB Lewisham. The scheme require...

Sugar House Island

Sugar House Island is a 10.5 hectare regeneration scheme in Stratford, just south of the Olympic Par...

IKEA Sheffield

Development of a new 330,000 sq. ft. retail development for IKEA including new retail space, warehou...

New Walk Centre Offices

BWB Consulting were appointed to provide structural, civil and geotechnical design services on this ...

IKEA Exeter

Development of a new 300,000 sq ft retail development for IKEA including new retail space, warehousi...

IKEA Greenwich

A new IKEA store in the heart of the London Borough of Greenwich. The IKEA store is a 3-storey build...

Student Accommodation, Portswood Road

BWB are proud to be involved in this purpose-built state-of-the art student accommodation in Southam...

Parr Street, London

BWB are proud to be working on this luxurious new high spec 4 storey residential development in Hoxt...

Gloucester Gateway Motorway Services Area

In 2012 BWB were appointed as the Civil and Structural Engineer for the new £40m dual-sided Glouces...

Cystic Fibrosis Unit, City Hospital

The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide home-in-hospital...

University of York - Phase 1 & 2 Plasma Institute

BWB Consulting were employed directly by the University of York for the 2 phases of the Plasma Insti...

Arena Central, Birmingham

BWB Consulting is providing multi-disciplinary engineering services to Arena Central Developments Lt...

Westwood Park Link Road (A49 Goose Green)

BWB is leading the design of the £16M A49 Goose Green to Westwood Park Link Road in Wigan, Greater ...

Dandara Arena Central, Birmingham

The Dandara residential development is the second development on the Arena Central site and consist...

Imperial Street, Bromley-by-Bow

Commissioned to enable the construction of the Imperial Street development of 900 new homes as well ...

Inspired Villages Schemes - Various

BWB are providing a complete range of Pre and Post Planning services to Inspired Villages who are de...

Phoenix 10

BWB's involvement in this 44-acre urban regeneration project commenced when we were appointed by Hen...

JQ Rise

£35m development of 280 apartments over 24 floors in the centre of the Birminghams Jewellery Quarte...