Our experienced track design team are capable of delivering permanent way solutions for light rail, passenger network and private freight infrastructure projects.
We do not work on Network Rail frameworks and so are fully independent from the regulatory authorities and are able to deliver the best value driven solutions for our Clients.
We are agile and capable. Our work encompasses minor upgrade projects to mega new build projects in the UK, Israel and Australia.
DESIGN SERVICES
Track Alignment /Maintenance and tamping schemes /Renewals /Enhancements, remodelling, greenfield /Track Structure /Track componentry (in liaison with manufacturers) /Switches and Crossings (S and C) /Gauging and Clearances /Track Drainage /Level Crossings /Platforms.
ENGINEERING SERVICES
Wheel-Rail Interface studies /Track Noise and Vibration studies /Independent checking and auditing /Network Rail Assurance roles: CEM, DPE, CRE-Track, PE-Track /Rail stressing schemes /Track standards writing /Multi-disciplinary engineering integration /CAD and BIM /Technical Experts /Project definition and feasibility studies.
MANAGEMENT & REPORTING SERVICES
Planning, resourcing and programme management (P6, MS Project etc.) /Quantitative based risk analyses and mitigation proposals /Technical contract and requirements management /Procurement/BOQs/Cost estimates (quantity surveying) /Document/Drawing Control systems /Testing and Commissioning /Client and stakeholder management.
SITE BASED SERVICES
Track visual survey, scoping and asset inspection /Topographical rail surveys (through BWB survey team*) /Tunnel and platform gauging /Switches & Crossing inspections /Factory Acceptance Tests for track products (rails, sleepers, fastenings etc) /Track installation engineering supervision.
Name: Andrew Davies
Job Title: Service Director - Rail Track
E: andrew.davies@bwbconsulting.com
Name: Stefan Zalega
Job Title: Executive Director - Rail and International
E: stefan.zalega@bwb-consulting.com
The Core Valley Lines (CVL) Transformation is a £740m programme of works that forms a significant p...
BWB were appointed by Nexus to undertake survey and design work for the renewal of life expired Swit...
BWB have been appointed to undertake the surveys and option selection for the gauging workstream of ...
BWB was appointed as the multi-disciplined designer by the Isle of Man Railways to produce a track r...
BWB were appointed by Shapir Civil & Marine Engineering Ltd to undertake the track for the J-NET Jer...
BWB's Client, Rendel were appointed by Eurotunnel as the Principal Contractor to design & construct ...
BWB provided a fully integrated civil and structural design for the rail terminal.
BW...
BWB worked closely with Midlands Metro to review their light rail route between Birmingham and Wolve...
BWB played a key role in Nottingham's NET Phase 2 tram extension, delivering transport, traffic sign...
East Midlands Gateway is a nationally significant infrastructure project. This £500m logistics park...