We understand that time is a critical factor when acquiring sites, but we never forget that it is also vital to obtain an understanding of the engineering characteristics of a site as early as possible during the due diligence process.
We assist our Clients in quantifying the risks and opportunities associated with new acquisitions by providing flexible, pragmatic advice on key engineering issues; whether it be by producing a simple review document or getting more fully involved.
Full involvement is typically presented in the form of an Engineering Desk Appraisal, which covers the issues of transport, flood risk, drainage, ground conditions & utilities. It would involve full engagement with the local regulatory authority and site investigation work including topographical and building measurements, preliminary cut & fill earthworks appraisals, highway & drainage feasibility studies and cost estimates, abnormal cost appraisals and utility studies.
Name: Karen Sinclair
Job Title: Accounts Manager
E: Karen.Sinclair@bwbconsulting.com
Kingsway business park has a drainage system in place, with a sewer network adopted by United Utilit...
The site is located on the southern edge of Nottingham and comprises a residential development of 30...
Unity Square provides 28,000m2 of Grade A office accommodation over ten storeys for HMRC at the hear...
New 2 storey & single storey Sixth Form Teaching Block on a brownfield site, within the grounds of t...
BWB have worked closely with Therme Group and Peel to bring plans to build the UKs first city-based ...
BWB supporting Pinnacle Property (SMAA Developments) with the promotion of a strategic residential l...
The secondary school comprises a new 5 storey, brick clad educational facility in the grounds of an ...
Project involved the regeneration of the former Lucas Battery Factory in Selly Oak and then the deve...
This development comprises 298 privately owned apartments over 11 storeys with retail and commercial...
The project comprises the construction of a new active campus and student village in the heart of th...
350 PRS apartment scheme which has helped deliver much needed affordable and flexible living to Nott...
A flood defence scheme in the centre of Derby which saw BWB and nmcn partner to deliver improvements...
BWB were commissioned to provide advice to support the land sale of this proposed residential develo...
BWB Consulting were employed directly by the University of York for the 2 phases of the Plasma Insti...
Nottingham One is a mixed use commercial and residential scheme comprising 290,000 sq. ft. of develo...
BWB's involvement in this 44-acre urban regeneration project commenced when we were appointed by Hen...
The regeneration of the Seedley area of Salford to provide new 160 new dwellings and infrastructure ...
BWB have partnered with nmcn and DSA to design and build a new public realm scheme for College Stree...
BWB recently undertook the New Walk / King Street Public Realm detailed design for Leicester City Co...
The client has submitted a hybrid planning application for a proposed mixed use residential led deve...