Contact Us:

0115 924 1100
nottingham@bwbconsulting.com

Contact us

Carbon Management, Energy and Sustainability Bookmark and Share

Conservation of our natural resources has to be the starting point of all of our design work, policies, statements and strategies.

As knowledgeable Energy Assessors and Auditors, we pride ourselves that we help our Clients, both public and private, to formalise effective strategies which will be sustainable and deliver energy derived cost savings and carbon reduction.

BWB provides multidisciplinary advice on energy and carbon management, ranging from policy development and strategy reviews through to engineering design and implementation via planning and permitting support. We are able to provide advice in the following areas:

•  Development of energy & carbon management strategies

•  CIBSE Low Zero Carbon and Energy appraisals & advice

•  Energy monitoring & targeting

•  Feasibility assessments for on-site energy generation from renewable sources such as wind, solar & photovoltaics

Sustainable design is the thread which runs through each of our projects from start to finish. By always being part of our design ethos, the majority of our project work achieves higher BREEAM/EPC ratings than expected.

 


Related Projects

Napier Gateway, Luton

Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Stirling Place which incorporates 685 residential apartments of up to 17 ...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Somerleyton Road, Brixton

Somerleyton Road is an exciting community partnership that will see around 303 new homes, a theatre, a range of mixed uses including a new flexible community space, an educational space, cultural and ...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

RAD Building, University of Nottingham

The Research Acceleration and Demonstration (RAD) Building is a new £7 million research facility at the University of Nottingham's Jubilee Campus. The research lab is set to be one of the most energy...

Key contacts: Peter Davies Rachel Cheetham

View Project » Create & Download PDF Document »

Hammond Student Accommodation, Chichester

BWB's London based M&E team were selected to be part of the Bond Bryan Architects lead design team for this new build student residential development located in Chichester. The development will provid...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Southgate Student Accommodation, Leicester

BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposite De Montfort University campus. The site compromises four buildings s...

Key contacts: Mark Jones Kris James

View Project » Create & Download PDF Document »

Coral Springs Care Village

The new build Coral Springs Care Village development in Witney, Oxfordshire for Richmond Villages provides the following accommodation:-
- Village Care Centre from Basement to Second Floor inco...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Resorts World, Birmingham

BWB Consulting is proud to have been the Civil and Structural Engineers for Resorts World at Birmingham's NEC. The £150m development includes a casino, four star hotel and five-star suites, spa inclu...

Key contacts: Mark Jones Andy Passmore

View Project » Create & Download PDF Document »

Horsham Gates

BWB are initially providing engineering consultancy services for the refurbishment of two existing office buildings in Horsham, with potential to extend the residential site in the future. The scheme...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Gloucester Gateway Motorway Services Area

In 2012 BWB were appointed as the Civil and Structural Engineer for the new £40m dual-sided Gloucester Gateway Motorway Services Area (MSA) between Junctions 11a and 12 of the M5. BWB were brought on...

Key contacts: Simon Hilditch Darren Hodgson

View Project » Create & Download PDF Document »

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Southwater Leisure District

Southwater Leisure District in Telford incorporates prime town centre offices, new leisure space including cinema, hotel, restaurants and the council's extensions to the existing ice rink, Mecca Bingo...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Generator London Hostel Refurb

BWB was excited to take on the challenge of upgrading this 800 B&B backpackers and party hostel in central London housed within a Grade 2 Listed Building.

The hostel underwent signific...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Cystic Fibrosis Unit, City Hospital

The new £6.6M Cystic Fibrosis unit at the City Hospital Nottingham aims to provide 'home in hospital' for around 250 adult Cystic Fibrosis patients from Nottinghamshire and surrounding.

...

Key contacts: Mark Jones

View Project » Create & Download PDF Document »

Chettles Yard, Nottingham

Completed in three phases in 162 weeks, Chettles Yard student accommodation centre sprawls over 10 acres and provided 1,063 student accommodation units also houses five retail units, a Magnet Showroom...

Key contacts: Colin Langford

View Project » Create & Download PDF Document »

Contacts

Name: David Stairmand
Job Title: Group Director - Buildings & Built Environment

E: David.Stairmand@bwbconsulting.com