Contact Us:

0115 924 1100
nottingham@bwbconsulting.com

Contact us

Building Physics Bookmark and Share

BWB's highly skilled Sustainable Building Services team use the fundamental principles of Building Physics to ensure the we deliver successful buildings which provide comfort for the occupant by the most energy efficient method.

Thorough site investigation and simulation can significantly reduce costs and risks to a build. Analysing and understanding the physics of environmental conditions in conjunction with the physical attributes of the proposed building produces highly accurate simulation data and the more certain the data ensures better Low or Zero Carbon Technologies (LZCT) options are selected.


Related Projects

Coombe Road, New Malden

A proposed development in New Malden has been granted planning approval. Plans include demolishing the buildings at numbers 5 to 29 Coombe Road and building one three-to-five storey and one six-to-se...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Napier Gateway, Luton

Napier Gateway in Luton forms part of the overall 24.5 hectare, £300 million mixed-use regeneration scheme at Napier Park and Stirling Place which incorporates 685 residential apartments of up to 17 ...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Somerleyton Road, Brixton

Somerleyton Road is an exciting community partnership that will see around 303 new homes, a theatre, a range of mixed uses including a new flexible community space, an educational space, cultural and ...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Hammond Student Accommodation, Chichester

BWB's London based M&E team were selected to be part of the Bond Bryan Architects lead design team for this new build student residential development located in Chichester. The development will provid...

Key contacts:

View Project » Create & Download PDF Document »

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts:

View Project » Create & Download PDF Document »

Horsham Gates

BWB are initially providing engineering consultancy services for the refurbishment of two existing office buildings in Horsham, with potential to extend the residential site in the future. The scheme...

Key contacts:

View Project » Create & Download PDF Document »

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

Southwater Leisure District

Southwater Leisure District in Telford incorporates prime town centre offices, new leisure space including cinema, hotel, restaurants and the council's extensions to the existing ice rink, Mecca Bingo...

Key contacts: David Stairmand

View Project » Create & Download PDF Document »

York Sports Village

York Sport Village was a £9 million sports facility on Heslington East Campus that featured a competition-standard, eight lane, 25-metre swimming pool, learner pool, full size 3G Astroturf pitch and ...

Key contacts: Dominic Ginty

View Project » Create & Download PDF Document »

Chettles Yard, Nottingham

Completed in three phases in 162 weeks, Chettles Yard student accommodation centre sprawls over 10 acres and provided 1,063 student accommodation units also houses five retail units, a Magnet Showroom...

Key contacts: Colin Langford

View Project » Create & Download PDF Document »

Contacts

Name: Jim Benson
Job Title: Operations Director M&E

E: Jim.Benson@bwbconsulting.com


View Profile »

Name: Leon Maddison
Job Title: Director

E: leon.maddison@bwbconsulting.com


View Profile »