PROJECT DESCRIPTION

Replacement of defective timber windows. Original timber window frames were installed in a very substandard way, contrary to current good practice. Frames are both vertically out of plumb and twisted within their apertures. What is certain is that this defect has occurred during installation and not post construction. Discrepancies of more than 40mm were noted within the reveals of a 1.4m window aperture horizontally.

Defect analysis and report writing, preparation of the specification and scope of works, Project Management, quality assurance monitoring, on site valuations.

Removal and replacement of 42 bespoke timber windows to 2 detached properties.