Dollands Moor Rail Freight Yard and Modalohr Station

Key facts

Year Completed

2020

Value

£40m

Client

Rendel Ltd

Build Type

New Build

Breeam Rating

n/a

Interested in working with us?

Contact us today

BWB's Client, Rendel were appointed by Eurotunnel as the Principal Contractor to design & construct a new Modalohr Station within Dollands Moor Depot in order to provide additional capacity for the loading/unloading of commercial freight vehicles on the UK Terminal. This will become part of an overall project known as 'Terminal d'Avenir. The new system will enable the loading/unloading of several wagons simultaneously.

BWB was appointed by Rendel as their rail design consultancy and instructed the start of GRIP 3 design for Signalling, Track & OLE. BWB acted as the main integrator for the delivery of Signalling, Track and OLE designs.

The project is nearing the end of GRIP stage 3, where BWB is providing a lead role in the interface with Network Rail.

Services Used

Rail Signalling
Rail Track