CLIENT
Morgan Sindall
YEAR COMPLETED
2016
BUILD TYPE
New Build
SERVICES PROVIDED
Civil Engineering
Environmental Consulting
Flood Risk
Ground Improvement
Ground Investigation
Structural Engineering
Transport Assessment
Transport Planning
BWB were appointed by Morgan Sindall to provide civil and structural engineering services for 2 phases of student accommodation in Leeds. The new All Saints Court complex at Leeds Trinity University Colleges main campus in Brownberrie Lane offers students a contemporary split-level, L-shaped building and features ten bedrooms specially adapted for students with disabilities.
The main structure comprised of an 8 and 9 storey braced steel frame with profiled metal deck floors. Strict floor to floor heights provided a significant challenge to the design team. The use of 3D revit software ensured that services coordination was achieved without any clashes.
The en-suite bedrooms are arranged into flats of six, each with its own shared kitchen. In order to fast-track the construction process, pre-fabricated bathroom pods were utilised and craned into position as the building was erected.
The main structure comprised of an 8 and 9 storey braced steel frame with profiled metal deck floors. Strict floor to floor heights provided a significant challenge to the design team. The use of 3D revit software ensured that services coordination was achieved without any clashes.
The en-suite bedrooms are arranged into flats of six, each with its own shared kitchen. In order to fast-track the construction process, pre-fabricated bathroom pods were utilised and craned into position as the building was erected.
The main structure comprised of an 8 and 9 storey braced steel frame with profiled metal deck floors. Strict floor to floor heights provided a significant challenge to the design team. The use of 3D revit software ensured that services coordination was achieved without any clashes.
The en-suite bedrooms are arranged into flats of six, each with its own shared kitchen. In order to fast-track the construction process, pre-fabricated bathroom pods were utilised and craned into position as the building was erected.