CLIENT
Select Property Group
YEAR COMPLETED
2019
BUILD TYPE
New Build
SERVICES PROVIDED
Building Information Modelling (BIM)
Building Physics and Facade Engineering
Civil Engineering
Drainage Strategies
Earthworks
Flood Alleviation and Mitigation Design
Geotechnical Engineering
Ground Improvement
Ground Investigation
Structural Engineering
Topographical Surveying
Transport Assessment
Transport Planning
Utilities
Utilities Surveys
Water Engineering and Management
BWB Consulting has delivered multidisciplinary engineering and environmental services for this student accommodation scheme which is being constructed on the site of the former BBC Pebble Mill studios in Birmingham. The 6-storey building provides 357 self-contained bedrooms together with a movie room, gymnasium, self-service breakfast bar and 24-hour operated reception desk.
The scheme was constructed using a combination of insitu concrete, castellated steelwork frame and lightweight steel framing with offsite manufactured techniques.
The scheme was fully coordinated with an adjacent new BWB designed Flood Alleviation scheme requiring tunnelling and thrust boring under existing highways.
Peter Davies
Business Unit Manager
View profile | contact