Contact Us:

0115 924 1100
nottingham@bwbconsulting.com

Contact us

JNET French Hill Light Rail Depot

Key facts

Year Completed

2020

Value

£50m

Client

CAF

Build Type

New Build

Breeam Rating

n/a

Interested in working with us?

Contact us today

BWB was selected as the Signalling Layout designer for French Hill Depot in August 2020 by CAF Signalling. A JV of CAF and Shapir in autumn 2019 won the $2.4billion contract with Jerusalem Transportation Masterplan Team (JTMT) for the Design, Build, Maintain and Operate on a 25 year concession, an extension of the existing Red Line and a new Green line. The project is due for completion in 2025.

BWB's scope consisted of the Signalling Design for French Hill Depot extension work, which included provision of the 1:250 Detailed Layout, along with a detailed design report containing Signalling Architecture and Equipment Specifications, Positioning Rules, Layout Schematic, Route Tables, Compliance Issues/constraints for both the existing & new equipment and proposed Cable Route Pit connections.

Services Used

Rail Signalling

Key contacts

Paul Robilliard

Paul Robilliard
Service Director - Rail Signalling
View profile | contact