x

Education Bookmark and Share

BWB has substantial experience in the planning, design and implementation of a wide variety of both new build and refurbishment projects across all categories of the education sector.  We have undertaken numerous school and college projects under the BSF and Academies Frameworks, together with extensive work in the Higher Education sector for Universities across the UK.

Our experience ranges from projects to provide a single new classroom for a school, to the conversion and refurbishment of existing listed buildings for a technology college, to the design of iconic new university buildings within either city centre or campus settings.  Whilst the majority of projects have been solely for academic purposes, such as teaching and research, we have also helped to deliver a wide range of ancillary projects such as sports and leisure facilities and medical centres, performing arts centres, libraries, nurseries and student union facilities.

Projects

Barr's Hill School

New Build Teaching Block, extension to existing science Block and refurbishment of a further 3No. existing blocks to create new changing facilities, additional teaching facilities and increased dining...

Key contacts: Leon Maddison

View Project »
Create & Download PDF Document »

Christ Church School

Extension to existing school to create 4No. additional classrooms and provision of additional WCs and Group Rooms at Christ Church CE Primary School, Walsall.

BWB Consulting provided Me...

Key contacts: Leon Maddison

View Project »
Create & Download PDF Document »

Fairham Pastures

The site is located on the southern edge of Nottingham and comprises a residential development of 3000 dwellings, employment, schools, community buildings, extensive footpaths and cycleways, and a com...

Key contacts: Darren Hodgson

View Project »
Create & Download PDF Document »

Kings Heath Boys

BWB supported the planning submission in 2020 providing transport planning, plus noise and vibration services.

Kings Heath Boys School was a 5-form entry (FE) senior school operating s...

Key contacts: Shirley Dumigan Mike Barrett

View Project »
Create & Download PDF Document »

Pinner High School

Pinner High School consists of several interlinking buildings which were built at different times throughout its history, the original quadrant shaped building and tower dates from 1937.

...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

President Kennedy School

New 2 storey & single storey Sixth Form Teaching Block on a brownfield site, within the grounds of the President Kennedy School

The project comprised of a braced, 2 storey and single st...

Key contacts: Richard Day

View Project »
Create & Download PDF Document »

Saracens School

Saracens School is a new-build, three storey education building with a separate sports block on a brownfield site in Colindale, London.

This large imposing school comprises of two wings...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Selly Park Girls School

New science teaching block, external escape stair and ramp along with internal remodelling of existing buildings at Selly Park Girls School, Birmingham.

The site was located at the rear...

Key contacts: Richard Day

View Project »
Create & Download PDF Document »

University of York - The Management School

The project involved the change of use and refurbishment of the old Smith and Nephew research and development building into The York Management School for the University of York.

This ...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Harris Academy Clapham

The secondary school comprises a new 5 storey, brick clad educational facility in the grounds of an existing primary school in London. The building includes an adjoining suspended sports hall at seco...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Loughborough University Student Village

The project comprises the construction of a new active campus and student village in the heart of the Loughborough University Campus. The development incorporates fourteen buildings providing 617 bedr...

Key contacts: Peter Davies

View Project »
Create & Download PDF Document »

Edison Primary School

The project aimed to demolish the existing Heston House to build Edison Primary School on its existing site, to create a 3 form-of-entry primary school. The new 630 place 3 storey primary school inclu...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Leeds SEMH Schools

As a city Leeds is thriving and has seen a significant growth in its population.

This includes an increase in the number of children and young people needing support, particularly in th...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

RAD Building, University of Nottingham

The Research Acceleration and Demonstration (RAD) Building is a new £7 million research facility at the University of Nottingham's Jubilee Campus. The research lab is set to be one of the most energy...

Key contacts: Peter Davies Rachel Cheetham

View Project »
Create & Download PDF Document »

Callendar Farm

Provision of engineering and environmental advisory services, with respect to an outline Planning Application for the development of agricultural land off the A5 Watling Street, Nuneaton.

Key contacts: Stuart Nelmes

View Project »
Create & Download PDF Document »

Mawney Foundation School

The project comprises the demolition of the existing 1896 school building and construction of a new 3 storey educational facility in the grounds of the existing school.

The new school i...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Southgate Student Accommodation, Leicester

BWB are excited to be working on this large redevelopment of a former bus station site in the historic heart of Leicester, opposite De Montfort University campus. The site compromises four buildings s...

Key contacts:

View Project »
Create & Download PDF Document »

Biomedical Phases 1 & 2, University of York

BWB Consulting were instructed by The University of York through Faithful &Gould to undertake civil & structural design services for a proposed new Biomedical & Natural Sciences Building off Wentworth...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

East Side Locks Student Accommodation

BWB were proud to provide multi-disciplinary engineering services for Alumno Developments 659 bed Student Accommodation project at Number 1 City Locks, a new £35 million student accommodation scheme ...

Key contacts: Stuart Nelmes

View Project »
Create & Download PDF Document »

Harington School, Oakham

Harington School is a £4.2m new build sixth form centre including general teaching classrooms, specialist information technology classroom, science laboratories, music practice and performance facili...

Key contacts: Glenn Foulk

View Project »
Create & Download PDF Document »

Joseph Leckie Academy Phase 1

The project involves the creation of a new three storey standalone ICT rich teaching block on the existing Joseph Leckie Academy campus.

The project was delivered using BIM technology...

Key contacts: Jim Benson

View Project »
Create & Download PDF Document »

Lakeside Academy, Telford

Lakeside Academy in Telford principally accommodates a new build primary school and secondary school, with post sixteen and community functions incorporated within the secondary school building all of...

Key contacts:

View Project »
Create & Download PDF Document »

Charlton Academy, Telford

Charlton Academy principally accommodates a new build secondary school, with a data centre servicing the local education network positioned within the academy. BWB undertook concept through to detail...

Key contacts:

View Project »
Create & Download PDF Document »

Edith Borthwick School

The Edith Borthwick School is an SEN school which caters for youngsters with learning disabilities aged three to 19. The project, which forms part of the Education Funding Agency's Priority Schools Bu...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Ernesford Grange Community Academy

Ernesford Grange Community Academy in Coventry is due to be handed over this week, 6 weeks ahead of schedule.

The new academy is one of 5 schools being delivered as part of the 'Midlan...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Holy Trinity Academy (HTA), Telford

Holy Trinity Academy principally accommodates a secondary school, with community functions incorporated into the school building. BWB undertook concept through to detailed design of the mechanical and...

Key contacts: Jim Benson

View Project »
Create & Download PDF Document »

QMP: Main Library Refurbishment Phase 1 and 2

QMP acted as the Quantity Surveyor on the refurbishment to the existing library for University of Westminster. The scheme involved the remodelling of the existing space and opening up of the old parti...

Key contacts: Anthony Hart

View Project »
Create & Download PDF Document »

Telford Co-Operative Academy

Telford Co-Operative Academy principally accommodates a secondary school, with changing rooms for use by the adjacent tennis centre incorporated into the school building. A data centre is provided whi...

Key contacts:

View Project »
Create & Download PDF Document »

QMP: University of Oxford Condition Surveying

Our commission included the preparation of condition survey and reports for a number of important and significant university buildings, including Grade I and Grade II listed properties.

...

Key contacts:

View Project »
Create & Download PDF Document »

University of York - Velodrome

BWB Consulting is proud to have been involved in the construction of a 250-metre outdoor tarmac velodrome at the University of York. The £1.1m development on the Heslington East campus was to provide...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

QMP: University of Birmingham Learning Centre Refurbishment

QMP provided client side project management & quantity surveying services for the scheme, which involved remodeling the lower ground and ground floor of the existing building, complicated by the requi...

Key contacts: Anthony Hart

View Project »
Create & Download PDF Document »

Darlington Campus, University of Teesside

BWB Consulting were a major part of the winning bid team for the delivery of the striking Darlington Campus Building for Teesside University. A major feature of the building is the creation of a 'shi...

Key contacts:

View Project »
Create & Download PDF Document »

University of York - Phase 1 & 2 Plasma Institute

BWB Consulting were employed directly by the University of York for the 2 phases of the Plasma Institute. The Plasma Institute is an industry linked facility that researches and patents new and innova...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

Farnley Park Academy, Leeds

The £23M improvement scheme to Farnley Park Maths & Computing College contract was constructed as part of the Leeds Building Schools for the Future (BSF) programme. The project involved the construc...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »

School of Sports Science, University of Teesside

BWB Consulting were a major part of the winning bid team put together to deliver the School Of Health and Sport Science Extension for Teesside University at their city centre campus in Middlesbrough. ...

Key contacts:

View Project »
Create & Download PDF Document »

Conkers Discovery Centre

This award-winning attraction in the heart of National Forest is located within a reclaimed mining area which is surrounded by a mature woodland environment. The primary objective of the project was t...

Key contacts: Peter Davies

View Project »
Create & Download PDF Document »

Adam's Building, Nottingham

Originally built for 600 workers involved in lace production, the Adams Building was considerably extended to cope with a rapid growth in demand for its quality products. It is now the home of Clarend...

Key contacts: Peter Davies

View Project »
Create & Download PDF Document »

Brough South

BWB are delivering a range of multi-disciplinary services for the £100 million Brough South mixed-use development in Yorkshire. The 175-acre site in the town of Brough includes the former airfield of...

Key contacts: Ashley Lowe

View Project »
Create & Download PDF Document »

Faculty of Business & Law, De Montfort University

BWB's multidisciplinary expertise played a key role in the delivery of this £22 million flagship scheme for the University, which embraced sustainable principles in architecture, structure, heating, ...

Key contacts: Peter Davies

View Project »
Create & Download PDF Document »

Pebble Mill, Birmingham

The historic Pebble Mill site, part of the Calthorpe Estate in Edgbaston, was the BBCs Birmingham home for over 40 years. Its phased redevelopment by Calthorpe Estates is transforming the site into a ...

Key contacts: Stuart Nelmes

View Project »
Create & Download PDF Document »

Trafford Waters

Trafford Waters is a high density residential development with mixed use and commercial elements located in Trafford City, adjacent to the Manchester Ship Canal and near to the Trafford Centre. The d...

Key contacts: Warren Bennett

View Project »
Create & Download PDF Document »

QMP: University of Cambridge Condition Surveying

Our work covers the undertaking of condition surveys and preparation of reports for the entire estate over a 7 year ‘cycle’ programme. Reports cover a 10 year capital works Forward Maintenance Pla...

Key contacts:

View Project »
Create & Download PDF Document »

York Sport Village

BWB provided multi-disciplinary consultancy services for the £9 million York Sport Village on the University's Heslington East Campus. Our input included civil, structural and geotechnical engineerin...

Key contacts: Dominic Ginty

View Project »
Create & Download PDF Document »