Structural and Civil Engineering

BWB Consulting was originally established around the single core discipline of Civil and Structural Engineering and this discipline continues to represent a significant proportion of our group turnover.

Our reputation is based on our ability to deliver innovative yet practical and commercial solutions on every project with which we are involved.

This reputation has enabled us to develop strong and longstanding client relationships which have encompassed a wide range of major civil and structural engineering projects.

Services We Offer

  • Structural Engineering Design in Concrete, Steelwork, Masonry and Timber
  • Earthworks and excavation
  • Ground Improvement and Stabilisation
  • Foundations
  • External Works
  • Earth and water retaining structures including Reinforced Earth design
  • Drainage and infrastructure design and co-ordination
  • Foul and Surface Water Drainage
  • Roads, service yards car parks and footpaths
  • Bridges and tunnels (Highway Structures)
  • Demolition of structures and temporary works design
  • Renovation and repair of historic buildings
  • Marine Engineering
For more information please contact: Civil Team and Structure Team

Example of Civil and Structural Projects

(Listed by Alphabetical Geographical Location.)

  • Birmingham: Centenary Plaza

    The BWB design, which removed the need for transfer structure and the resultant downstand beams, will result in major cost and time savings.....
  • Birmingham:   Centenary Plaza

  • Birmingham: Curzon Street

    Bespoke structural engineering solutions required to optimise the construction of the blocks each with their own distinct engineering challenges to tight construction......
  • Birmingham:   Curzon Street

  • Birmingham: Heritage Court

    Due to the unusual shape of the building footprint, the entire structure, which is over 100m in length, was designed not to require movement joints......
  • Birmingham:   Heritage Court

  • Birmingham:   The Heights on Corporation Street

  • Birmingham: The Orion Building

    Due to the high concentration of vertical loadings the substructure design comprised large diameter bored piles, with an acoustic.....
  • Orion Building, Birmingham

  • Blackpool: North, Central and South Piers

    Our involvement extends to the survey, advice and maintenance projects for each pier, together with strengthening works to accommodate the plethora of rides and buildings....
  • Blackpool:   North, Central and South Piers

  • Blackpool: The Tower

    BWB were involved in the major refurbishment which included the installation of new high speed passenger lifts to the Tower structure and a glass floor at the Tower top....
  • Blackpool:   The Tower

  • Bournemouth: Criterion Arcade

    With the exception of an ornate façade that was retained to the front elevation, remainder of the building was demolished and replaced with a new steel framed structure...
  • Bournemouth:   Criterion Arcade

  • Bristol: Temple Plaza

    Temple Plaza is a proposed 10,000m² office development on the sites of the Grosvenor and George and Railway Hotels on Temple Gate....
  • Bristol: Temple Plaza

  • Bristol: The Works

    Electrically operation rise and fall staircases, rotating bars and lighting rigs all formed part of the scheme and involved extensive structural alterations......
  • Bristol: The Works

  • Coventry: Keresley Park

    BWB provided Engineering and Environmental services in the redevelopment of this major ‘brownfield’ site from pre-acquisition through masterplanning to advanced detailed design..
  • Coventry: Keresley Park

  • Derby: Joseph Wright Six Form College

    A key element of the design was to integrate the need for clear open spaces within the multi-storey building whilst maintaining a route for services through the structural fabric....
  • Joseph Wright Six Form College

  • Derby: Leicester Square

    Remains of a buried Roman wall to be left insitu; Chlorinated solvents were present under site as a result of dry cleaning processes....
  • Leicester Square

  • Derby: Merchant Street

    Through a quantitative risk assessment BWB were able to reduce the quantity of contaminated soils that were necessary to remove from the site.....
  • Derby: Merchant Street

  • Derby: Pride Park

    Originally site was derelict industrial land that had been historically used by the rail, gas and aggregate industries, heavily impacted by contamination and ground gases ....
  • Derby: Pride Park

  • Derbyshire: Toyota, Burnaston

    BWB proposed an innovative alternative scheme that shaped the parking area such that all rainwater run-off was collected.....
  • Toyota, Burnaston, Derbyshire

  • Willow Farm Business Park

  • Doncaster: Audi Dealership

    The site provides 17,000 square feet of motor trade showroom and workshop with associated external car display areas and parking.....
  • Doncaster: Audi Dealership

  • Doncaster: Quest Park

    Scheme comprises a mixture of motor trade, retail, industrial and office space on an acre site next to the River Don, the site having previously been developed for industrial usage....
  • Doncaster: Quest Park

  • Doncaster: Westmoor Park

    The earthworks constrained by minimum clearance to overhead electric cables, have been designed to provide a cut to fill balance.....
  • Westmoor Park, Doncaste

  • Essex: Esporta Health and Fitness Club, Chigwell

  • Glasgow: Esporta Golf and Country Club at Dougalston

  • Harlow: Town Centre Redevelopment

  • Hull: Motor Vehicle Training Centre

    BWB have undertaken the geo-environmental investigations on the site and subsequently undertaken the civil structural design of the buildings.....
  • Hull:  Motor Vehicle Training Centre

  • Hull: Performing Arts Centre

    Results of the chemical testing undertaken on the soil sample showed elevated levels of hydrocarbons and heavy metals within the soil where deemed.....

  • Leeds: Centrica

    Although the reinforced concrete framed building was completed in 2000, an extensive refurbishment of the former O2 office was required to achieve Centrica´s requirements.....
  • Leeds: Centrica

  • Leicester: Facilities Building De Montfort University

  • Leicester: Opal Court De Montfort University

  • Leicester: The Newarke Building, De Montfort University

  • Leicestershire: Interlink Park, Bardon

    BWB have been involved since 1996 as civil and structural engineering design consultants for this 150 acre industrial and distribution pack development.....
  • Leicestershire: Interlink Park, Bardon

  • Lincolnshire: Witham St Hughs, Swinderby

  • London: IKEA Edmonton

    IKEA purchases 8 hectare (20 acre) contaminated brownfield site adjacent to an operational gasholder, BWB.....
  • IKEA Edmonton, London

  • Northamptonshire: Desborough and Rothwell SDAs

  • Nottingham: Corner House

    Redevelopment of part of the existing General Hospital site, caves were known to be present, an extensive probing exercise to ensure absence of voids under foundations.....
  • Nottingham: Corner House

  • Nottingham: Eastside, The Island

    Prestigious multi-million pound development scheme that will transform a 17 hectare (42 acre) site at the heart of Nottingham´s Eastside Regeneration Zone.....
  • Nottingham Eastside

  • Nottingham: Experían

    Site previously accommodated the Wilford Power Station, consequently, contamination, land gas and difficult ground conditions all had to be addressed at design stage.....
  • Nottingham: Experían

  • Nottingham: Galleries of Justice

    Previously, known as the Shire Hall, extensive investigation into the underlying sandstone which was known to contain a number of caves and voids....
  • Nottingham: Galleries of Justice

  • Nottingham: Glasshouse

    The Glasshouse is a mixed use residential/retail development being constructed on a site created by the demolition of two adjoining.....
  • Nottingham: Glasshouse

  • Nottingham: Litmus Building

    The Litmus Building is Phase I of The Litmus Project, which is the largest residential new-build project of its type, yet built in Nottingham.....
  • Nottingham: Litmus Building

  • Nottingham: NET Line 1

    BWB were instrumental in the outline design of shared junctions and street running sections, having particular regard to the needs of pedestrians and cyclists.....
  • Nottingham: NET Line 1

  • Nottingham: ng²

    Closure of Nottingham´s Royal Ordnance factory, industrial site on the south-western edge of the city centre, left behind a legacy of ground contamination resulting.....
  • Nottingham: ng²

  • Nottingham: Nottingham Business Park

    BWB have been involved as geo-environmental, civil and structural engineering design consultants for this major regional business park development since.....
  • Nottingham: Nottingham Business Park

  • Nottingham: The Turning Point

    The Turning Point is Nottingham City Council´s ambitious multi-million pound project, BWB successfully lobbied for significant changes to the proposals.....
  • Nottingham: The Turning Point

  • Nottingham: Trinity Square

    BWB successfully negotiated the revised City Council plans which will create a high quality and largely traffic free environment on the critical frontages.....
  • Nottingham: Trinity Square

  • Nottingham: Waterside

    Nottingham Waterside is a prestigious mixed-use development located along the River Trent Nottingham. Nottingham´s Waterside will create a new sustainable community on the waterfront at Trent Basin ....
  • Nottingham Waterside

  • Nottingham: Weekday Cross

    The new structure comprises a reinforced concrete structural framed basement incorporating a contiguous piled retaining wall, suspended reinforced concrete floor....
  • Nottingham: Weekday Cross

  • Nottinghamshire: Top Wighay Farm, Hucknall

  • Rugby: Junction 1 Retail Park

    Our geo-technical and environmental division undertook a significant investigation to establish the extent of contamination due to the previous use of the site....
  • Rugby: Junction 1 Retail Park

  • Sheffield, Kelham Island

    The superstructure consists of a steel podium over the basement car park, which in turn supports 5 stepping to 7 storeys of modular construction.....
  • Sheffield, Kelham Island

  • Sheffield: The Forge

    The proposed development consisted of a 1160 bedroom student accommodation village complex, with associated retail and common room space.....
  • Sheffield: The Forge

  • Sandwell Care Centre, Birmingham