A to B Locations
Birmingham: Centenary Plaza
The BWB design, which removed the need for transfer structure and the resultant downstand beams, will result in major cost and time savings.....
Birmingham: Curzon Street
Bespoke structural engineering solutions required to optimise the construction of the blocks each with their own distinct engineering challenges, to enable a very tight....
Birmingham: Heritage Court
Due to the unusual shape of the building footprint, the entire structure, which is over 100m in length, was designed not to require movement joints......
Birmingham: The Fort
The 79 acre site was found to be contaminated with a variety of contaminants, mainly petroleum hydrocarbons and heavy metals. Significant contamination was present.....
Birmingham: The Heights on Corporation Street
The Heights Complex has been built on a key site adjacent to Aston University providing students with state of the art ergonomic living accommodation and recreational.....
Birmingham: The Orion Building
Due to the high concentration of vertical loadings the substructure design comprised large diameter bored piles, with an acoustic.....
Blackpool: North, Central and South Piers
Our involvement extends to the survey, advice and maintenance projects for each pier, together with strengthening works to accommodate the plethora of rides and buildings....
Blackpool: The Tower
BWB were involved in the major refurbishment which included the installation of new high speed passenger lifts to the Tower structure and a glass floor at the Tower top....
Bournemouth: Criterion Arcade
With the exception of an ornate façade that was retained to the front elevation, remainder of the building was demolished and replaced with a new steel framed structure...
Bristol: Temple Plaza
Temple Plaza is a proposed 10,000m² office development on the sites of the Grosvenor and George and Railway Hotels on Temple Gate....
Bristol: The Works
Electrically operation rise and fall staircases, rotating bars and lighting rigs all formed part of the scheme and involved extensive structural alterations......
Head Office: 0115 9241100










